A tool to conduct the financial cost and contribution estimations of a reserve study.
Annual Inflation Rate (r), Low Bound
Annual Inflation Rate (r), High Bound
Component Model Component,UL,RUL,Cost_Original,Cost_Low,Cost_High Pool Furniture - Replace,5,0,4600,3680,5520 Pool - Resurface,10,5,10000,8000,12000 Roof - Replace,20,18,80000,64000,96000 Asphalt - Seal,5,2,5000,4000,6000 Asphalt - Resurface,20,2,25000,20000,30000 Building - Repaint,10,1,50000,40000,60000 Elevator - Modernize,20,5,80000,64000,96000 Hallways - Refurbish,8,6,24000,19200,28800
Simulations will take more than twenty seconds. Be patient.
Run Simulation